Escondido Update

The Escondido city area is now operational. the tracks feeding the packing plant are all powered, all of the micro switches for the turnouts have been installed. Buildings such as the icehouse and others that would be in the city area still need to be built and installed and then the area needs to have scenery, roads, parking lots, etc., done. For now, though, Escondido is open for switching work!